Initiative 2.5.5: Complete the non-powered water sports feasibility project.
Q1:Complete
Creation of high-level concept plan for NPWS precinct completed that will contribute to the future foreshore infrastructure Master Plan, along with the formation of a precinct network group.1/09/2023
Initiative 2.5.5: Complete the non-powered water sports feasibility project.
Q1: Completed
Creation of high-level concept plan for NPWS precinct completed that will contribute to the future foreshore infrastructure Master Plan, along with the formation of a precinct network group.1/09/2023