Coastal & foreshore management

8 initiatives across 3 years

Underway this year

3

all on track at end of March 2026

Delivery record

3 of 5

past initiatives completed · 2 on track, not yet complete

2025–262 initiatives
1.3.1 Noosaville Foreshore PlanQ3 · On Track · The 20-year plan is progressing through PID initiations, including the Changing Places Facility, Gympie Terrace. The Changing Places facility has progressed to design completion, with community engagement indicating broad support for both the siting and design of the facility. Construction tender award scheduled for May. Revetment Wall and asset renewals supported by available funding and grant applications.
1.3.2 Eastern Beaches ForeshoreQ3 · On Track · This is an annual implementation program. Works are progressing as planned to deliver resilient ecosystems within limited budget, community education, and upgraded infrastructure. Turtle engagement material distributed via mail and workshop. Urban Wildlife Gardens event was hosted in conjunction with NICA, targeting engagement with Eastern Beaches residents. Scoping works with Council's Coastal and Foreshore Officer for beach access upgrades has occurred.
2024–252 initiatives · 1 finished on time
1.3.2 Eastern Beaches ForeshoreQ4 · On Track · Education material is complete, and the public awareness campaign has started. A restoration program is underway within available budget and resourcing, and the beach infrastructure access manual is nearing completion (80%).
2023–243 initiatives · 2 finished on time
1.3.2 Noosaville Foreshore PlanQ4 · On Track · The community has been engaged on the 80% masterplan document during Q4 of 2023/24, and Council are working through a variety of feedback with the expectation of an additional community engagement round being required before progressing to 100%. Note-relisted in the new 24/25 Operational Plan
1.3.3 Main Beach Erosion ManagementQ4 · Completed · Dredging and renourishment works for the SEMP project were completed June 2024. Some additional channel formation is also completed, and an asset renewal program will be required to maintain the shoreline following works completion.
1.3.4 Eastern Beaches ForeshoreQ4 · Completed · Plan complete and endorsed by Council.
2025–261 initiative
4.8.6 Main Beach sea wallQ3 · On Track · Design refinement ongoing to meet stakeholder expectations including adaptable construction and improved aesthetics and amenity to minimise negative stakeholder sentiment. Stakeholder engagement ongoing. Revision to timing and cost under negotiation with QRA and NEMA.