Skip to content

Open Council is in active development and is not affiliated with or endorsed by Noosa Council. The data shown may be incomplete or incorrect — always check Council's own published documents before relying on it.

Sign in

erosion

3 initiatives across 3 years

Underway this year

1

1 with disruption at end of March 2026

Delivery record

0 of 2

past initiatives completed · 1 on track, not yet complete

2024–251 initiative · 0 finished on time

1.3.3 High-risk erosion areas · ended the year with minor disruption

Progress through the High-Risk Erosion Prone Area Working Group has stalled due to staff vacancy and changes. A Noosa Eastern Beaches Creek Erosion Risk study has been delivered by consultants, covering geotechnical, hydrological & vegetation assessments at the nine creeks along the Eastern Beaches. Assessments were used to identify slope stability risks as well as urgent, short, medium and long term actions to reduce these risks. Actions vary from urgent remediation works through to longer term revegetation and weed control.

2023–241 initiative · 0 finished on time
1.3.1 Coastal Hazards Adaptation PlanQ4 · On Track · Works progressing with investigations into the Eastern Beaches coastal creeks budgeted within 2023/24 and continuing into 2024/2024, informing future works requirements. Note-relisted in the new 24/25 Operational Plan
2025–261 initiative
4.8.4 High-risk erosion areasQ3 · Minor Disruption · Contract awarded and construction commenced for Sunshine Creek. Ground conditions require a design revision and revised construction methodology. Continued risk to timing being managed. Other coastal erosion mitigation works are dependent on funding for revegetation works to Council's Strategy and Environment team.